291 Seneca St
Buffalo, NY 14204
This technical presentation will focus on the unique design methodology and construction challenges associated with the Cleveland Drive Bridge Replacement, which is comprised of a 215’ long composite steel multi-girder superstructure with rigid connections to the abutments.