(NOTE: This is NOT in Kohler! It is North of Sheboygan and East of I43 in Mosel. Click on Driving Directions for more accurate details on this location.)
Kohler Power Systems
N7650 CTH LS
Kohler, WI 53044
Enter parking lot from County Hwy LS (Lakeshore Rd.)
Meet in main lobby for registration.
Newport Shores
407 E. Jackson St.
Port Washington, WI 53074
Choice Of:
5:30 PM Gather & Check-In
6:00 PM Tour & Presentation
7:30 PM Leave for Newport Shores
8:00 PM Dinner & Announcements.
Members $20
Non-Members $25
Students $10
Spouses $10
Tour Only $0
ONLINE REGISTRATION WILL BE OPEN THROUGH 10/1/17 AND SPACE IS LIMITED.
Tour of Kohler Power Systems
This month we travel to the headquarters of Kohler Power Systems Northeast of Kohler in Mosel. The Kohler Co. was founded in 1873 and made cast iron and steel implements for farmers. Most employees were immigrants. They are now one of the oldest and largest privatly held companies in the U.S.
Kohler Power Systems has 6 manufacturing plants worldwide. Two of them are in Wisconsin (Mosel & Saukville). Accross all of the plants, they manufacture Industrial Generators (4-3250kW), Marine Generators (4-200kW), Residential Generators (5-20kW), Light Commercial Generators (40-150kW), Mobile Generators (5-20kW), ATS (Auto Transfer Switch) to 4000 amps, Switchgear and Controls.
At the Mosel plant, they do:
1. The laser and Water jet foam cutting areas.
2. Assembly and Testing of the Generators
3.Final enclosure Packaging
4. And the ATS and Switchgear Manufacturing and testing Areas
5. The Distributor training facilities (time permitting)
Because we are touring an industrial plant, we ask that you wear closed toe shoes and bring safety glasses if possible.
Kohler Power Systems has the right to refuse admittance of anyone registered for this tour.